Lower Bottom Rd Slide Repair

An extensive slide occurred on Lower Bottom Road due to heavy rains last summer.  The project included excavation of all poor soils and backfill with shot rock.  Also included other items related to the stabilization work.  Project area was then resurfaced and guardrails added.

Lower Bottom Road Before

LB Slide Before 1

Lower Bottom Rd During

LB Slide During

Lower Bottom Rd Before

LB Slide Before 2

Lower Bottom Rd After

LB Slide After